Call Us

H BEAM FORMWORK SYSTEM

To help several construction projects handling companies in safely making the structures, here, we are offering H Beam Formwork System. This H shaped structure is basically used to have clean, smooth & accurate finishing on the concrete and is also economical due to reducing timber cost. The simple to handle and ready to use product minimizes the work at the construction sites and is easy to understand by the traditional labor of the building sites. As compare to the use of convectional timber, this one cost 1:3 in ration of 5. Further, offered range stays in regular demand for having professional designs and making formwork schemes.

Key Features:
  • H Beam formworks are light in weight and no making (alterations) is required of them
  • No skilled supervision is needed for making the form work as compare to needed in the conventional timber form work.
  • Have high stiffness and load bearing strength
  • Weather and water-proof and also have sealed beam end
Product Image (2)

H20 beam formwork for Building Constructions

Price: 6500 INR/Square Meter
  • Delivery Time:1 Months
  • Supply Ability:300 Per Month
Product Image (32)

Table Formwork

Price: 6500 INR/Square Meter

Key Features:

  • Easy to assemble and disassemble
  • Sturdiness
  • High load strength

Product Image (28)

Custom Made Formwork

Price: 6500 INR/Square Meter
  • Supply Ability:300 Per Month
  • Delivery Time:1 Months
  • Thickness:2 Millimeter (mm)
  • Height:600 Millimeter (mm)
  • Material:Aluminum
  • Length:2.25 Millimeter (mm)
  • Platform Loading Capacity:6.25 Metric Ton
Product Image (26)

H16 / H20 Formwork Beams

Price: 6500 INR/Square Meter
  • Height:600 Millimeter (mm)
  • Thickness:2 Millimeter (mm)
  • Material:Aluminum
  • Length:2.5 Millimeter (mm)
  • Platform Loading Capacity:6.25 Metric Ton
  • Delivery Time:1 Months
  • Supply Ability:300 Per Month
Product Image (33)

H Beam Column Formwork

Price: 6500 INR/Square Meter
  • Delivery Time:1 Months
  • Supply Ability:300 Per Month
  • Width:6 -10 Foot (ft)
  • Thickness:18 Square Feet
  • Height:50 Centimeter (cm)
  • Diameter:2.50 Meter (m)
  • Length:6.0 Meter (m)
  • Platform Loading Capacity:6.25 Metric Ton
Product Image (31)

Slab Formwork System

Price: 6500 INR/Square Meter
  • Platform Loading Capacity:6.25 Metric Ton
  • Thickness:2 Millimeter (mm)
  • Height:600 Millimeter (mm)
  • Material:Aluminum
  • Length:2.25 Millimeter (mm)
  • Delivery Time:1 Months
  • Supply Ability:300 Per Month
Product Image (27)

H Beam Curved Wall Formwork

Price: 6500 INR/Square Meter
  • Platform Loading Capacity:6.25 Metric Ton
  • Height:600 Millimeter (mm)
  • Thickness:2 Millimeter (mm)
  • Length:2.25 Millimeter (mm)
  • Material:Aluminum
  • Supply Ability:300 Per Month
  • Delivery Time:1 Months
Product Image (34)

Climbing Formwork

Price: 6500 INR/Square Meter

Salient  Features:

  • Easy to assemble
  • Sturdy design
  • Durable service life

Product Image (36)

Aluminium Formwork Beam

Price: 6500 INR/Square Meter

Features:

  • Easy installation
  • Durable design
  • Corrosion resistant

Product Image (37)

H Beam Wall Formwork System

Price: 6500 INR/Square Meter
  • Supply Ability:300 Per Month
  • Delivery Time:1 Months
  • Thickness:2 Millimeter (mm)
  • Height:600 Millimeter (mm)
  • Length:5.0 Centimeter (cm)
  • Material:Aluminum
  • Platform Loading Capacity:6.25 Metric Ton
Product Image (USE 08)

Climbing Formwork System

Price: 6500 INR/Square Meter
  • Platform Loading Capacity:6.25 Metric Ton
  • Length:1.2 Millimeter (mm)
  • Material:Aluminum
  • Thickness:2 Millimeter (mm)
  • Height:600 Millimeter (mm)
  • Delivery Time:1 Months
  • Supply Ability:300 Per Month
X